Out of the Stands and Onto the Field

FECORE. Our game is revealing reality and the game is on. Field Engineers Core has invited you to come out of the stands as a spectator and come on to the field. FECORE was founded in Nov 2017. Its purpose has never changed. Our mission is perform unbiased research...

read more

Force The Level May Update

On May 18 and 19th the second and far more detailed observation in the Force The Level project will be performed. A team will assemble in Denver Colorado and exact differential leveling over a distance of 2 miles will be performed. The procedure is set and the methods...

read more

Mechanical Gyro May Update

The purpose of the mechanical gyroscope project is to provide a method to directly demonstrate the rotation of the earth on its axis. So far there have been no reliable tests which prove this. Foucault pendulums have been shown to be inconsistent and only produce the...

read more

Expanding Our Efforts

Expanding Our Efforts From the start of FECORE we stated that our members and subscribers would be able to help accomplish the mission of FECORE. Through months of trial and effort we have found a way we think will expand the work. We have decided to use an online...

read more

Mechanical Gyro March Update

The purpose of the mechanical gyroscope project is to provide a method to directly demonstrate the rotation of the earth on its axis. Although the Foucault pendulum is claimed to accomplish this there is enough reports of Foucault pendulum constructions which did not...

read more

Force the Level March Update

The planned Force the Level measurements did not take place on March 9th and 10th due to concerns regarding the weather. The observation site is at 5431 ft (1655m) elevation near Denver, Colorado, US. Many locations at 39° north are saying goodbye to sub freezing...

read more

FECORE Force the Level Pre test results.

FECORE Force the Level Pre Test was performed in September 2018 by members of FECORE to verify the validity of the method proposed and to gather data on a relative short distance. Feel free to download, share and discuss these results.  ...

read more

Airy’s Failure FECORE Success January Update

In our November newsletter we introduced a new project Airy’s Failure FECORE’s Success. It is the plan to replicate the extremely significant test performed by George Biddle Airy in 1871. The project is in the research phase so we will update the research information....

read more

Multi Stage Balloon Project Update

The Multistage Balloon project is still in the design and planning stage but the design requirements and priorities are taking shape. Four balloons are still the plan. A center large one to pull the entire assembly aloft then the other three to maintain the altitude....

read more

Force The Level January Update

In September 2018 FECORE performed the first measurements in the Force the Level project. It was anticipated that we could obtain another set of data in October. Due to work schedules and the rental equipment being unavailable the test has now been scheduled for March...

read more