Mechanical Gyro March Update

Mechanical Gyro March Update

The purpose of the mechanical gyroscope project is to provide a method to directly demonstrate the rotation of the earth on its axis. Although the Foucault pendulum is claimed to accomplish this there is enough reports of Foucault pendulum constructions which did not...
Force the Level March Update

Force the Level March Update

The planned Force the Level measurements did not take place on March 9th and 10th due to concerns regarding the weather. The observation site is at 5431 ft (1655m) elevation near Denver, Colorado, US. Many locations at 39° north are saying goodbye to sub freezing...
SALAD V2 January Update

SALAD V2 January Update

SALAD is an acronym for Super Accurate Laser Aiming Device which is the device used in FECORE’S long distance laser observations. It is used with the TLT or terrestrial laser targeting system. Observations at or over 25 miles would be impossible with out it. And we...
Long Distance Microwave Transmission Update

Long Distance Microwave Transmission Update

Our goal is to establish a microwave link between two points in the range of 150 km. We have focused our efforts on finding one location on the southeast coast of the UK and the other location in the Netherlands. If a permanent high quality link can be established at...
Airy’s Failure FECORE Success January Update

Airy’s Failure FECORE Success January Update

In our November newsletter we introduced a new project Airy’s Failure FECORE’s Success. It is the plan to replicate the extremely significant test performed by George Biddle Airy in 1871. The project is in the research phase so we will update the research information....