A Breath of Fresh Air

FECORE, Inc.

The desire for truth is a powerful motivator.

Out of the Stands and Onto the Field

FECORE. Our game is revealing reality and the game is on. Field Engineers Core has invited you to come out of the stands as a spectator and come on to the field. FECORE was founded in Nov 2017. Its purpose has never changed. Our mission is perform...

Force The Level May Update

On May 18 and 19th the second and far more detailed observation in the Force The Level project will be performed. A team will assemble in Denver Colorado and exact differential leveling over a distance of 2 miles will be performed. The procedure is...

Mechanical Gyro May Update

The purpose of the mechanical gyroscope project is to provide a method to directly demonstrate the rotation of the earth on its axis. So far there have been no reliable tests which prove this. Foucault pendulums have been shown to be inconsistent...

Expanding Our Efforts

Expanding Our Efforts From the start of FECORE we stated that our members and subscribers would be able to help accomplish the mission of FECORE. Through months of trial and effort we have found a way we think will expand the work. We have decided...

Mechanical Gyro March Update

The purpose of the mechanical gyroscope project is to provide a method to directly demonstrate the rotation of the earth on its axis. Although the Foucault pendulum is claimed to accomplish this there is enough reports of Foucault pendulum...

Force the Level March Update

The planned Force the Level measurements did not take place on March 9th and 10th due to concerns regarding the weather. The observation site is at 5431 ft (1655m) elevation near Denver, Colorado, US. Many locations at 39° north are saying goodbye...

FECORE Force the Level Pre test results.

FECORE Force the Level Pre Test was performed in September 2018 by members of FECORE to verify the validity of the method proposed and to gather data on a relative short distance. Feel free to download, share and discuss these results. ...

Airy’s Failure FECORE Success January Update

In our November newsletter we introduced a new project Airy’s Failure FECORE’s Success. It is the plan to replicate the extremely significant test performed by George Biddle Airy in 1871. The project is in the research phase so we will update the...

Multi Stage Balloon Project Update

The Multistage Balloon project is still in the design and planning stage but the design requirements and priorities are taking shape. Four balloons are still the plan. A center large one to pull the entire assembly aloft then the other three to...

Force The Level January Update

In September 2018 FECORE performed the first measurements in the Force the Level project. It was anticipated that we could obtain another set of data in October. Due to work schedules and the rental equipment being unavailable the test has now been...

Mechanical Gyro Update

Great progress has been made on the construction of the FECORE mechanical gyro. We appreciate the hours of labor and mental designing by Stefan Poiss. This instrument will be used in the project Mechanical Gyro Motion Testing here on fecore.org....

FECORE 501(c)3 Status Update

FECORE is a non-profit corporation registered in the U.S. in the State of Indiana. Since November 2017, we’ve been applying with the U.S. Internal Revenue Service (IRS) to be approved as a 501(c)3 non-profit organization. The purposes of a 501(c)3...

 

Contribute to FECORE without signing up

 

Contact Us

We would love to answer any questions or schedule a meeting. Please feel free to send us an email using the form below.

Send the message to...

4 + 4 =